Home / Dredging / Bolivar Peninsula

BOLIVAR PENINSULA · GULF OF MEXICO & EAST BAY

Dredging in Bolivar Peninsula, TX.

Bolivar Peninsula's coastal properties take a beating every storm season. Seawall repair, shoreline stabilization, and post-storm debris removal are in constant demand along Crystal Beach and the rest of the peninsula.

Coastal storm recovery. Seawall repair, debris removal, shoreline stabilization.

DREDGINGBOLIVAR PENINSULA

Custom Quote

priced by cubic yard · permit coordination included

  • Residential slip & canal dredging
  • Restore navigability
  • Spoil removal & disposal
  • Permit coordination included
GET A QUOTE

RESULTS

Bulkhead installation before and after — Bolivar Peninsula, TX

Typical result — eroded shoreline stabilized with timber bulkhead, Bolivar Peninsula area.

Dredging in Bolivar Peninsula — FAQ.